Tuesday, July 10, 2012

Graham Ave Renovations - Second Bedroom Edition

2nd Bedroom before - More pink walls (see Living Room post below), more distressed subfloor acting as hardwood (see Master Bedroom post below), and a door to one very sketchy addition (see House Exterior post below) full of squirrel nests!
2nd bedroom after - New plush carpeting installed, door replaced with new window, new electrical outlet installed beneath window, neutral wall paint.
2nd Bedroom Closet before - Bathroom pipe blocking with only one rod for hanging clothes.


2nd Bedroom Closet after - Pipe is enclosed into a new wall (allows for deeper closet space in bathroom, too - see Bathroom Edition post below), another hanging rod is installed for pants in front, and a shelf installed above. Carpet installed on floor (not shown) and new paint freshen the space.





1 comment:

Thanks for viewing! Please feel free to leave a comment.
If you like our work, please like us on Facebook:
www.facebook.com/aboardandbeyond